En ZWY80 muck loaders has arrived at the mine, bringing advanced excavation capabilities to underground operations. Its production capacity of 80m³/h allows mining teams to handle ore and debris efficiently, reducing operational delays.

Suitable for tunnels 2.4*2.4m or larger and slopes between 5–10 degrees, this loader features a reliable belt transmission system that ensures consistent performance in challenging conditions. Its design emphasizes safety, efficiency, and compactness.

En ZWY80 muck loaders is now fully deployed, offering mining sites a powerful and efficient solution to improve underground excavation and material transport.

Póngase en contacto con nosotros

EQUIPO HNYT

Podemos mostrarle nuestra fábrica por vídeo en directo. Por favor, envíenos directamente la consulta a nuestro Email o póngase en contacto con nosotros en Whatsapp.

Dirección No. 48, Liancheng avenue, Jiuhua Industrial Park, Jiuhua Economic Zone, Xiangtan City, Hunan, P.R,China

Correo electrónico : export@ytequipment.net

Teléfono:86 17369222201

 

Síguenos

Copyright @ 2024 HNYT EQUIPMENT Todos los derechos reservados.

es_ESSpanish